Proposed Temporary Road Closure – The Causeway, Clophill enable the Carriageway Resurfacing to take place in safety. The restrictions are to be in operation only when the necessary signs are erected on site. The Legal Order will be made to cover a 12 month period. Length affected: Full Length This road closure is likely to take place between 6th July to 6th October (more exact dates will be sent closer to the time) the closure will be from 0800-1800hrs.
Diversion: Head south-west on High St towards The Causeway Turn left onto Bedford Rd/A6 At the roundabout, take the 1st exit onto A507 Destination will be on the right.
These works are being done by CBC/Ringway Jacobs.